Nantlle Railway - Pant


As the line approaches Pant, a footpath runs off to the left on to a slight embankment This may have been the Nantlle route,  but the exact location is unclear. The line went on to cross the Llanfaglan road on the level, all trace being lost under the bank built to carry the road up to the later railway bridge.
The line ran behind Pant farm  It rejoined the WHR near this point  just beyond Pant farm on the approach to Hendy crossing
The formation  leading up to Hendy crossing is wider, as it was the site of Pant station, the temporary terminus of the Carnavonshire Railway after its opening  in 1867.The station was closed when the remainder of the route through Caernarfon was completed in 1870. Beyond Hendy crossing the footpath takes a sudden turn to the left on to a rise.
In this overgrown area between the footpath and the WHR was a temporary transhipment point to transfer goods back from standard gauge to narrow gauge for the final journey into Caernarfon, pending completion of the final segment of the Carnarvonshire Railway The double transfer transfer of slates required after the arrival of the Carnarvonshire Railway,  namely from narrow gauge to standard gauge near Penygroes, and  back to narrow gauge at Pant, greatly added to the cost of transport as well as causing damage to the cargo,  much to the irritation of the quarry owners.
The routes finally merge into the Coed Helen cutting